Hi all,
Question regarding CMS installation when migrating away from Lync 2010.
Here's a brief overview of topology
- Lync 2010 Pool in Data Centre 1
- Lync 2013 Pool #1 in Data Centre 1
- Lync 2013 Pool #2 in Data Centre 2
- Lync 2013 Pools are paired
Consider the following
- CMS located on SQL Backend server for Lync 2010 Pool
- CMS database installed on SQL Back end for Lync 2013 Pool #1. CMS is moved to this location
Now for correct pool pairing and failover capabilities I would assume that
- CMS database needs to also be installed on SQL back end for Lync 2013 Pool #2
Once this is done then Lync 2013 Pool #2 Front Ends should replicate back into the CMS stored on the back end SQL database for pool #2? Nothing else would need to be done? As soon as it's installed its now a backup?
If I'm reading into this correctly the following from TechNet is basically telling me to do this?
When you establish a pool pairing that includes the pool hosting the Central
Management store, a backup Central Management store database is set up in the
backup pool, and Central Management store services are installed in both pools.
At any point in time, one of the two Central Management store databases is the
active master, and the other is a standby. The content is replicated by the
Backup Service from the active master to the standby.
Thanks,
paul.